|
Making a new tower. The standoffs on the right are all that will remain of the old tower. |
|
These are the parts it took to make the old tower (less standoffs)/ |
|
|
The new tower. |
|
The new tower mounted. |
|
|
Another mounted view. |
|
The first flying run wire tray by UV light. |
|
|
The same view in regular light. |
|
The new tower design calls for a 1.25" plexi tube to be in the column to act as the reservoir. It will be lit by some UV LED strips. Here are QT movies of the light test. Lacking the plexi tube (not to mention the blue UV dye that will be in the water) I put some UV tubing in the column to simulate the water. The first two movies are really just the same, 4MB goes through 1 cycle and the the 8MB 2 cycles. The last one was done later and has two sets of lights installed, one is solid on and the other doing a pattern. |
|
|
text |
|
text |
|
|
text |
|
text |
|
|
text |
|
text |
|
|
text |
|
text |
|
|
text |
|
text |
|
|
text |
|
text |
|
|
text |
|
text |
|
|
text |
|
text |
|
|
text |
|
text |
|
|
text |
|